Downstairs Progress Report #2

We're still making progress downstairs!
  - Drywall is up!
  - prepping floors for tile
  - ready to repair the ceiling from all of the new wiring...

2 views of our new office with a snoopy onlooker lurking in the soon-to-be mud room
On the left: Because this spaced used to be a garage, there was a pretty drastic slope on the concrete floor - a gradual 2" decline that would have Kevin's office chair rolling away with him on it! So we've poured a self leveling floor to make up most of the difference - the rest can be made up when tiling.
On the right: in order to get the new lighting all wired in, we had to take a few sections out of the ceiling - but we plan to patch them right back in and respray. A lot of people get upset about popcorn ceiling, but whatev - we don't mind.
On the left: we've added a little inset cubby in the office to sit a bookshelf into.
On the right: our new hallway closet is coming together.
Finch the Foreman is inspecting the work. So far so good.
Next steps =
  - adding the heating coil element and thermostat to heat the office floor
  - start laying tile
  - get the dry wall taped and mudded
  - respray the ceiling

More to come!

2 comments:

  1. Wow so much work. I'm glad you won't be rolling downhill in any chairs when it's all finished though!

    ReplyDelete
    Replies
    1. Thanks for you comment! Yea, it's SO much work! and just when we think we're making more progress, something unexpected pops up and delays us - like electric! Whoever wired this place back in the day was..... Sheesh!
      We love sharing our progress! and really enjoy seeing your comments!
      thanks tons!

      Delete